How to calculate and display the Cp/Cpk value in MCA/CMM Reporting or procella immediately after entering the value is one of the recurring questions on the hotline. This is often seen as a problem, but the question itself is wrong for many reasons. In this very atypical document, the author explains this question, why it is not possible, and what the real concern behind this question is.
Table of Contents
Foreword
Again, and again the hotline or Q-DAS employees are asked whether the Cp/Cpk value can be calculated and displayed in the O-QIS products CMM-Reporting or procella directly after the value input.
For many reasons, the question alone is wrong. In this very untypical document, the author of this document (Thomas Gastgeb, hotline, and head of the hotline for 20 years) tries to explain these questions, why this is not possible, and what the real question behind this question is.
Procedural error with this question
Due to the fact that the O-QIS products do not have a setting to calculate the capability characteristic values directly after the value input, the "simulation" is carried out here in the value mask in qs-STAT.
Consider a feature, which is generally capable first:

Now a subgroup of values is recorded which makes the C-values go bad:

If this request where to be realised, it would only be an alarm in the O-QIS products.
So far, this would not be a problem.
Now the user records the next subgroup (after successful corrections of the process). A subgroup which again lies completely precisely in the middle of the tolerance:

In order to simulate again what would happen in the O-QIS, the evaluation is carried out:

As was to be expected, the index is of course still "bad". Because the measured values that led to the bad index are of course still in the calculation:
Means:
The user gets an alarm again: the capability indices would be still bad.
This "alarm" now runs through the entire coming data collection as long as the "bad values" are part of the calculation.

The result is over-regulation and massive user uncertainty during data collection
Philosophical error in this question
The "philosophical" flaw here is the requirement for the user and their level of training.
The classic user is guided in the O-QIS products by alarms such as:
- Measured value above / below limits
- Mean values above / below limits
- Standard deviations above / below limits
If data-entry staff see the C-values immediately after entry (whether only seeing or also alarmed, there is no difference here), the users must be trained in the knowledge of what this means.
- To which specification limit is one bad?
- What measures need to be taken to get the process stable again, and then capable?
- On which dataset will the bad evaluation affect? (This batch, the month...)
- What does this mean statistically for the calculation of the control charts, the stability of the process?
- Etc.
Means: All data entry staff need training in the direction of the Yellow Belt / Gren Belt in order to be able to make any statement at all about the significance of a bad C-value.
The real question and the error in its interpretation
In many cases, this very question is simply passed on and unfortunately distorted by the passing on. The real question is:
How is it ensured that the capability indices are always "capable"?
The question is of course justified. And the next chapter explains a solution to this. But behind this question is the question "What is capable?
While in earlier times it may have always been all characteristics that were evaluated according to CP / CPK > 1.33, nowadays many "characteristics" are recorded whose C-values are of no interest.
In the overall assessment of the evaluation strategy, various "requirements" can be stored for diverse forms of characteristics. The capability parameters are only a part of this. The characteristic may only be evaluated according to the maximum tolerance utilisation, according to trends, according to the stability of the QCC and similar indications.
Thus, a C-value calculation and its alerting is not always useful.
Solution to the question
The solution to the actual question is quite simple:
Data collection under the SPC guidelines for the SPC characteristics!
The consistent use of Q-DAS products enables a continuous SPC system while taking into account local "specialities" as they occur at each customer.
The procedure described here is in no way a substitute for detailed training on the subject of SPC. However, this can be trained by the Q-DAS Training&Consulting department.
The attempt of a short summary of a possible procedure (by no means all the correct wording of the SPC will be met here in the shortness):
- SPC-relevant characteristics are evaluated in the product qs-STAT, module Process Capability Analysis. If these are "capable" (stable and controlled), a quality control chart is calculated and saved for these characteristics.
- The data acquisition in the O-QIS products is carried out under the rules of the SPC with visualisation and alarming following these rules.
- If alarms occur, they are forwarded to the responsible persons through the options in the O-QIS products.
- If necessary, re-evaluations are carried out in the qs-STAT product, Process Analysis module, to check whether the capability still exists or whether, due to process changes, a capable process still exists but the quality control charts must be adapted to the process changes.